«

»

Print this Post

A34 Closures in October

Highways England plan to close the A34  between 9pm and 6am on the following nights to allow them to refresh the road markings and install LED road studs:

  • Tuesday 8th October for 3 nights – Northbound – A423 Hinksey Hill junction to the A44 Peartree Interchange
  • Friday 11th October for 3 nights – Southbound – A44 Peartree Interchange to the A423 Hinksey Hill junction
  • Monday 14th October for 3 nights – Southbound – A420 Botley Interchange to the A4130 Milton Interchange
  • Monday 21st October for 3 nights – Northbound – A4130 Milton Interchange to the A420 Botley Interchange
  • Tuesday 24th October for 3 nights – Northbound – M4 Chieveley Interchange to the A4130 Milton Interchange
  • Sunday 27th October for 3 nights – Southbound – A4130 Milton Interchange to the M4 Chieveley Interchange

All closures will be in place between 9pm and 6am.

These closures are to refresh the road markings and install LED road studs at the West Ilsley junction, Chilton junction, Milton Interchange, Hinksey Hill junction and the Botley Interchange, to improve safety to road users.

Diversions

For closures between the Hinksey Hill junction and the Peartree Interchange all traffic will be diverted via the Oxford ring-road.

For closures between the Milton Interchange and Botley Interchange standard traffic will be diverted via the A417, Wantage, A338 and A420 (southbound diversion the same in reverse). Heavy Goods vehicles will be diverted via the A420 between Oxford and Swindon due to unsuitability through Wantage.

For closures between the M4/Chieveley and the Milton Interchange standard traffic will be diverted via A4, A338, Wantage and A417 (southbound diversion the same in reverse). Heavy Goods vehicles will be diverted via the A420 between Oxford and Swindon due to unsuitability through Wantage.

Please be aware that these works have been carefully programmed but are subject to change due to weather conditions or unforeseen circumstances – please check the yellow signs placed in advance at the junction for confirmation of the closures dates/timings.

We would like to apologise in advance for any inconvenience or disruption caused during our work; if you have any questions, or if you’d like to know about our work please contact us on 0300 123 5000 or email info@highwaysengland.co.uk

601571 A34 Markings & Studs SH Letter (02-10-2019)

Permanent link to this article: http://www.radleyvillage.org.uk/a34-closures-in-october/